Left Elevator Prep and Trim System

November 30th and 26th 2018, 5h

I did counter skin the left elevator in the various locations it was called for.

IMG_0660.jpg

I prepared the trim system:

  • I spent a lot of time trying to determined where this 2. I called Vans and this 2 pieces are extra from another airplane, they were left in my trim box by mistake.

IMG_0657.jpg

  • Making the Holes in the correct location was tricking, but it worked out in the end with the use of a lo of clekos, clamps and testing throughout the drilling.
  • Also, I had to make few modification to the access plate so that the trim system can go in and out easily.

IMG_0659.jpg

IMG_0658.jpg

Then I looked into bending the sides of the elevator, where the trim tab will get places.  For that I need to cut a piece of wood with the taper of the elevator.  I don’t have any equipment to cut wood, so I went ahead and bought a band saw. Screen Shot 2018-11-30 at 6.15.15 PM.png