Worked on the tie down assembly:
- Grinned the brackets to size, since we only needed to remove about amm.
- Drilled matching hole with the main front spar.
We were not able to go ahead with the fabrication of the spacers wince we needed a blade for cutting metal for the bandsaw, so I ordered one to follow up on this work next time.
We started on the front wing spar, we worked on the plate nuts on the sides of the spar, for both wings:
- counter sinking the side holes for the rivets
- priming the holes
- riveting the plate nuts
- countersinking for the screws
Left wing
Right wing
We dimpled the access plates