February 16th and 17th, 16h
Matched drilled fuel tank attachment to the main spar for the left wing
Added stiffeners to both left and right fuel tank skins
Matched drilled the Left fuel tank
Prepared the inboard fuel ribs:
- Fabricated attachment brackets
- Cut the fuel inlets
- matched drilled the ring stiffeners
- Riveted the nut plates