June 23rd, 24th, 25th, 27th 16h
I continued on with the prep of both the left and the right flaps:
- finishing the fabrication of the inboard angles.
- deburring
- dimpling
- counter sinking the bottom of the back spar
- removing the vynil
- priming
The flaps are ready to be riveted.