Elevator Skin Prep and Riveting

October 28th and November 4th, 8th 2018, 8h

Prepared the stiffeners for both right and left elevators:

  • We cut the stiffeners.
  • We smoothed all the edges.

Prepared the skin and stiffeners for both right and left elevators:

  • Removed the venyl protection.
  • matched drilled the skins to the the stiffeners.
  • Deburred both skin and stiffeners.
  • Dimpled skin.
  • Dimpled stiffeners.

IMG_0596.jpg

IMG_0634.jpg

Back riveted the the right elevator

IMG_0631.jpg